13th November 2008
Version 2008.1.8

  • Fixed a problem that could cause an abend when processing timesheet updates in Project Server

  • Fixed a problem in the Product Description Form - if the Task Generation option to assign resource & duration to the Product Task was selected, the resource assignment was recreated each time you clicked 'OK' on the Product Description Form regardless of whether the data had changed. If you use integration with MS-Outlook in MS-Project, this would cause unnecessary update emails to be sent to the assigned resource.

  • Fixed a bug in the PBS window where entering product names on the PBS allowed you to enter a Line Feed character (via Ctrl+Enter) which then caused an unexpected error.

  • Fixed a bug in the process to export Issue Log to Excel, where the field showing 'Other Projects Impacted' was instead exporting the data for 'Other Products Impacted'.

  • Fixed a problem that could cause an abend when saving a project.

  • Changed where some application & temporary files are stored to aid with Windows Vista compatibility
     
  • Added a new message and progress bar when producing custom reports.

17th March 2008
Version 2008.1.7

  • Fixed a problem that caused a crash when running custom reports under MS-Project 2007 - this version of p2msp is the first version that officially supports MS-Project 2007

  • Changed the custom reports processing so that any formatting on rich text fields in any p2msp forms is now also shown on custom reports (for example the Purpose or Composition fields on the Product Description Form) - prior to this release any rich text fields were only shown as plain text on custom reports with no formatting.

  • Change to store the Logo File pathname uniquely in each project file - this means you can easily specify different logos for different projects, and p2msp will display the appropriate logo whenever you open that project file

  • Added two new keywords for custom reports (<Logo> and <LogoFullsize>) which enable you to automatically include the project logo on your custom reports
     
  • Fixed a problem that could occur when copying a Product or a group of Products in the PBS screen - if any of the copied products had sub-tasks with dependency links, additional dependency links were erroneously created between the sub-tasks of the copied Product and the new Product (thanks to Henk-Jan Molenkamp for finding this problem).

3rd February 2008
Version 2008.1.6

  • Changed the Risk Impact Quantification settings in the p2msp Options screen, so that these are now saved with your individual project file - this means that you can easily specify different settings for each project so that you can analyse your risks appropriately according to the size & scale of your project, and your settings will be remembered when you open your project file
  • Fixed a problem where the default settings for Library file pathnames could be incorrect - this would only occur if you installed p2msp using a different user name than your own user name (e.g. by using the Administrator account to install p2msp). We recommend that you install p2msp by granting administrator privileges to your own account if required.
  • Fixed a problem where an unexpected error might occur in unusual circumstances related to MS-Project Application DisplayAlerts settings
  • Fixed a problem which might occur whereby a new issue or risk might erroneously inherit the same hyperlink for a related document as a previously viewed issue or Risk
  • Fixed a problem where the text displayed on an optional message (i.e. one with a "Do not display this message again" checkbox) might be truncated under unusual circumstances
  • Fixed a problem where an unexpected error might occur on a Risk Form when clicking "OK", if the Risk Short Name was >10 characters in length

17th July 2006
Version 2006.1.4

  • added new options when displaying PFD for current PBS view, to include connection points external to the current view
  • changed PBS views dropdown in PBS toolbar to be a toolbar button
  • Added 'Do not generate sub-tasks' to Risk Form actions tab
  • Improved context-sensitive help via F1 key on any p2msp screen

13th July 2006
Version 2006.1.3

  • added new options when exporting a PBS diagram, to remove the on-screen colours and formatting from the generated document
  • fixed a minor problem whereby Report Library reports could be run against an empty Issue or Risk Log, causing an error - reports are now disabled if the log is empty

5th July 2006
Version 2006.1.2

  • fixed a problem which could occur when saving a project which contained no p2msp data

26th June 2006
Version 2006.1.1

  • new customisable Periodic Reports can save you time by automating your regular project reporting such as monthly Highlight reports
  • You can now arrange the Product Breakdown Structure to get exactly the display you want via our new PBS columns feature
  • Saving your own named views of the PBS now includes all aspects of the view - zoom level, drawing style, box shapes etc.
  • Data Storage methods are improved, speeding up your file saves and offering easier options for Project Server users
  • PFD views are improved so that you can customise multiple views of the PFD to display exactly as you want
  • New Risk Map option to plot Risks by a short name
  • New option to Hide Issues and Risks on the Gantt Chart when producing MS-Project reports
  • New "Help" messages, which can be switched off when no longer required
  • In the PBS window, if you hover the cursor over the PBS Views dropdown on the toolbar, it will display the name of the currently select view as a tooltip.
  • The Tasks Tab on the Product Description, Risk & Issue Forms is always enabled, even if there are no tasks. This means you can manually enter the initial tasks for a Product (or Issue or Risk) without having to exit to MS-Project.
  • A new Date Closed field has been added to Risk and Issue Forms, which can be entered when closing an item - this new field is used to drive the new periodic reporting for Risks and Issues. There is an automatic conversion process for users upgrading from previous versions, which will populate this field on existing closed Issues and Risks.
  • Prior to this version, sub-tasks could only be manually added to an active Issue or Risk. Now you can manually add sub-tasks to an Issue or Risk regardless of its status.
  • You can now right-click in an empty area of the PBS window, this will open a popup menu which enables you to adjust spacing between boxes in the PBS diagram.
  • When you click on the main p2msp toolbar to open any p2msp screen, the current MS-Project View, Filter and any Grouping will be saved and later restored when you exit the p2msp screen.
  • The range of custom report keywords for standard and custom MS-Project fields has been extended to include all of the new fields in Project 2003, including all Enterprise fields.
More version history...

 

   
New to Prince2?
Click here for more information about this hugely popular PM Methodology

_______

New to MS-Project?
Click here for more information about the #1 project scheduling software package

________

SPOCE - Tel: +44 (0)1202 736373 - Email enquiries@spoce.com
Prince2 Distance Learning
Practitioner - Accredited Training from just £299+VAT

 


Home | Overview | Details | Downloads | Tutorials | Support | Training & Events | Purchase | Contact | Privacy Policy
Copyright © 2003-2008 Structured Project Management Solutions Ltd. All rights reserved.